logo
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
<
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
Qualität Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty Fabrik
>

Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty

Markenname: HDB Boiler Economizer
Modellnummer: Ekonomiser
Herkunftsort: Zhangjiagang, China
Zertifizierung: ISO9001, ASME, EN, CE
Mindestbestellmenge: 1
Preis: $1,500

Produktdetails


Typ: Natürliche Zirkulation Struktur: Feuerrohr und Wasserrohr
Druck: Niedrig/Hochdruck Dampferzeugung: Max. 20 t/h
Stil: Vertikal Kraftstoff: Kohle / Gas / Kohle / Wasserspeise
Ausgabe: Heißwasser/Dampf Oberflächenbehandlung: Gestrichen
Material: Legierungsstahl, Kohlenstoffstahl, SA210C, SA213T22 Materialstandard: ASTM, EN oder ISO
Gewichtsbereich: Min: 10 Tonne, max: 1000 Tonne Schmelzverfahren: EF+LF + VD
Verfahren: Material-&gt; INGOT-&gt; HOT/KALD-ROLLING-&gt; WEDERBEHANDLUNG-&gt; Inspektion-&gt; Rauhbearbeitung- UT-Standard: ASTM A388 oder EN10228
Wärmebehandlung: Normalisierung + Mildern
Hervorheben

Max. 20t/h Steam Production Exhaust Gas Economizer

,

1 Year Warranty Boiler Economizer

,

More than 5 years Warranty Ship Spare Parts Economizer

Beschreibung des Produkts

Ship Spare Parts Exhaust Gas Boiler Equipment Economizer
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 0
Product Introduction

Boiler economizers are heat exchange devices with finned tubes that heat liquids (typically water) without exceeding the liquid's boiling point. We manufacture three types of boiler economizers:

  • Bare tube economizer
  • H-finned tube economizer
  • Spiral finned tube economizer

The H-finned tube economizer is a highly efficient heat exchanger consisting of H-finned tubes. Compared to bare tube economizers, H-finned tube versions offer:

  • Larger heat exchange area
  • Reduced number of tubes required
  • Increased flue gas flow area
  • Reduced flue gas flow speed and abrasion

H-finned tubes can be manufactured as double H-finned tubes with high rigidity for long tube row applications. The spiral finned economizer is a newly designed heat transfer equipment that overcomes serious abrasion issues and extends service life.

Product Function

The economizer functions to "economize" or save on cooling costs by allowing compressor shutdown while maintaining adequate cooling capacity, resulting in significant energy savings.

Technical Specifications
Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C, SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight Min: 10 ton Max.:1000 ton
Smelting Process EF+LF + VD
Process Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+ tempering)→Inspection→rough machining→UT→2nd Heat treatment→finishing machining→Inspection
UT standard ASTM A388 or EN10228, etc
Quality Control
  • Impact test and Strength calculation report with applied materials information
  • 100% NDT (non-destructive inspection) report of steel plate, tube and electrode
  • X-ray, γ-ray and liquid penetrant test inspection report (welding seam) to ensure boiler quality
  • Hydraulic test report to verify standard working pressure and safety
Product Gallery
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 1
Company Information
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 2
Certifications
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 3
Packaging & Shipping
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 4
FAQ
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 5
Contact Us
Ship Spare Parts Exhaust Gas Economizer with Max. 20t/h Steam Production and 1 Year Warranty 6

Produkt-Highlights

Ship Spare Parts Exhaust Gas Boiler Equipment Economizer Product Introduction Boiler economizers are heat exchange devices with finned tubes that heat liquids (typically water) without exceeding the liquid's boiling point. We manufacture three types of boiler economizers: Bare tube economizer H...

Verwandte Produkte
Qualität Hochdruck-Kessel Heizung Oberflächen Membranwand Argonbogen Schweißen für Biomasse-Kessel Fabrik

Hochdruck-Kessel Heizung Oberflächen Membranwand Argonbogen Schweißen für Biomasse-Kessel

High Pressure Power Boiler Heating Surface Membrane Wall Argon Arc Welding For Biomass Boiler Product Introduction Water wall panels with pins usually laid vertically on the inner wall of the furnace wall, it is mainly used to absorb the radiant heat emitted by the flame and high-temperature flue gas in the furnace.It is the main type of evaporating heating surface of all kinds of modern boilers and the basic component of boiler water circulation loop.Because of both cooling

Qualität Hochfrequente Schweiß-H-Finnen-Rohr-Ökonomizer für Kraftwerksboiler ASME Fabrik

Hochfrequente Schweiß-H-Finnen-Rohr-Ökonomizer für Kraftwerksboiler ASME

High Frequency Welding H Fin Tube Economizer For Power Plant Boiler ASME Product Description The boiler economizer is a device used to recover waste heat in industrial boilers, usually located at the tail of the flue of the boiler, which increases the feed water temperature and reduces fuel consumption by absorbing the heat of the flue gas, so as to achieve the effect of energy saving and emission reduction. But at the same time, as an environmental protection equipment, the

Qualität Kohlenstoffstahl SA192 Superheater Coil Argonbogen-Schweißen 100% PT Fabrik

Kohlenstoffstahl SA192 Superheater Coil Argonbogen-Schweißen 100% PT

Product Description: A boiler superheater is an essential component in a boiler system, responsible for increasing the temperature of steam produced by the boiler. One of the key products in this category is the Superheater Coil, designed to enhance the efficiency and performance of boiler systems. This particular superheater is suitable for various fuels, including coal, oil, and biomass, making it versatile and adaptable to different energy sources. The Superheater Coil

Qualität Boiler Industrial SA210A1 Stahlboiler Ökonomizer Wärmeaustauschteil ASME-Zertifizierung Fabrik

Boiler Industrial SA210A1 Stahlboiler Ökonomizer Wärmeaustauschteil ASME-Zertifizierung

Boiler Industrial SA210A1 Steel Boiler Economizer Heat Exchange Part ASME Certification Introduction The H-shaped finned tube is also known as the H-shaped fin tube, also known as the butterfly fin tube. It is to weld symmetrically two pieces of steel with an arc in the middle to form fins (ribs or butterflies), the frontal shape of which resembles the letter "H", so it is called the H-shaped finned tube. The two fins of the H-shaped fin tube are rectangular and approximately

Antrag A Zitat

Bitte nutzen Sie unser Online-Anfrage-Kontaktformular unten, wenn Sie Fragen haben, unser Team wird sich so schnell wie möglich mit Ihnen in Verbindung setzen.

Sie können bis zu 5 Dateien hochladen und jede Datei maximal 10M groß.